PlanMyEvent
← All modules
Production crew and transport
Logistics

Production crew and transport

Separate allowances for installation/strike crew, show coordination and freight.

Dimensions
Access route, dock, lifts and vehicle plan required
Cost range
Quote required — component rates, crew and logistics separate
Complexity
medium
Traditional
Minimalist
Modern
Floral
Bohemian
Theme-based
Rustic
Luxury
Art Deco
Botanical
Industrial
Immersive
Monochrome
Scandinavian

AI-generated setting inspiration. This shows an illustrative use, not the exact equipment or supplier stock.

Component layout study
Indicative component diagram
Specifications, components and production brief

Components and production brief

Planning allowances; confirm quantities, inclusions and supplier quotes for your event.

ComponentQuantity ruleSourcing
Show intercom (optional)

Confirm base station, wired/wireless packs and headsets as a system.

Product and equipment options
4 stationpartner quote
Installation / dismantling crew

Separate call durations, travel, overtime, meals, night shift and specialist riggers.

Product and equipment options
  • General installation crew call · general option Cost option
  • Scenic fabrication crew call · general option Cost option
  • Specialist rigging crew call · general option Cost option
4 personservice
Transport trip

Specify vehicle capacity, distance, loading, tolls, parking, stairs and return trip.

Product and equipment options
  • Dedicated return equipment trip · general option Cost option
  • Light commercial vehicle trip · general option Cost option
  • Medium equipment truck trip · general option Cost option
2 tripservice
  • Crew call hours and transport trips must be repriced for the actual schedule; do not double-count bundled labour.

Designs using this module